Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time. Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule. The
Hi,
I hope someone can help me. I got a Synology Nas and since I moved all my PSE stuff from my externl drives to the NAS, i cant play the trailer sequence in my PreShows anymore, but everything else works fine. I updated the directory to the NAS, PSE is able to write to it, I could choose single files for the actions and I use NFS.
I thought I could work around by adding a video module via directory, but then it does not show me my network storage. Only external drives and a root-system. But if I add a video module and choose a single file, I can choose the NFS Networkstorage. Has anyone an idea what the problem could be?