Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time. Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule. The
Hi,
I have local trailers for almost every movie, and do not have the YouTube add-on installed because historically for me is stays broken a lot. So I do not want that to be part of the PreShow Experience. I want PreShow to use only the trailers scraped into the KODI database. Yet when I use PreShow, I get the message that the YouTube add-on is required during the trailer sequence. Is there no way to prevent this?
This happens with versions 3.41. and 3.4.3. Never had this issue with CV before, so something in PreShow is different.
thx