Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time. Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule. The
Hi, first and foremost thank you for the work are you doing to support with project. I was wondering if there is a way to have a movie resume from the Kodi resume point with PSE? Whenever I use PSE it always starts the movie from the beginning. Am I missing something?
Thanks