Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time. Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule. The
Is Web 3.0 here? We don't know, but Kore 3.0 certainly is! Shiny, decentralized and software-based, it's ready to take over your old, centralized, atom-based remote.
As a major release there are lots of changes, too many in fact to list here, but the main ones are:
Migration to Google's Material 3 UI guidelines, which include:
Redesign of most of Kore's screens, namely:
Redesign of the notifications
... and lots and lots of code cleaning and generic bug fixing (like for instance, fixing the access to media storage in the local files section).
Given the level of changes, there certainly are bugs lurking around. If you find one, please let us know at the forum or on GitHub so we can make Kore a better remote.
Hope you like it.
View the full article