Hello, I recently updated my Hue Bridge to the Bridge Pro and now the lights won't work with PreShow Experience. This is all due to the Bridge Pro dropping HTTP support in favor of HTTPS with a self signed certificate (uses its' SN as the Common Name in the certificate). Basically anytime you try to access the Bridge Pro's API, it will fail SSL verification. A quick, but insecure, way to fix this would be to turn off SSL verification when making URL calls. Any way to make that an option in
Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time.
Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule.
The issue is that if I start the sequence a minute or two late, the entire schedule gets pushed back. I’d rather not have to keep watching the clock to make sure I hit 7:21 exactly.
Ideally, I’d like to place an action just before the trivia block that essentially says, “Wait here until 7:21 PM, then advance to the next item.” That way, I could start the sequence anytime before 7:21, and it would automatically move into trivia at the correct time.
Is there currently a way to accomplish this in PreShow Experience, or perhaps another method that would achieve the same result?
Thank you!