Curious if there’s a way to program a sequence action or other method to advance to the next item based on a specific clock time. Here’s the scenario I run into: we program outdoor movies in our park, and the schedule needs to be pretty precise. We typically run a 30-minute block of trivia while people get situated, followed by a 9-minute theater intro, with the feature film starting right at 8:00 PM. That means I need to start the sequence at exactly 7:21 PM to keep everything on schedule. The
We frequently set up a collection of 10 to 20 slides as a pre-show before our programming for 30 or so minutes using the Slideshow module. However, we encounter the slideshow limitation: once all the slides have been displayed once, the slideshow ends, regardless of the total duration set. To achieve our desired length, we duplicate and manually number the slides, which is quite cumbersome when looking to keep the same rotation order over and over.
Would it be possible to add a “loop” option to this module? This would allow the slides to restart either in alphabetical order or in a continuous random order, while keeping the background music uninterrupted. We believe this feature would also be beneficial for the Trivia module when the trivia set has been shown in its entirety.
Thanks for considering this request!
Best,
Spires